Legoland, Windsor, Berkshire

09/04/2021

County Gutters were contracted to install a new aluminium rainwater system to the newly refurbished theme buildings within the park. Samples were supplied free of charge togain approval, the products

Willton Homes, in Houghton, Hampshire

12/03/2021

County Gutters have just been awarded the contract, to supply and install all the aluminium rainwater goods and fascia’s,  to this new 14 house development by Willton Homes, in Houghton, Hampsh

Legoland Windsor

25/01/2021

Start day of Legoland replacing all the gutters and rainwater pipes on the theme buildings with all wonderfully coloured aluminium

West Country

21/01/2021

We are waiting for a weather window to start installation on this stunning West Country property, upgrading all the rainwater goods to a larger profile to accommodate the climate change we seem to be

Graylingwell Chapel, West Sussex

18/02/2021

We have just been awarded the contract by Chichester Community Development Trust to replace all the plastic gutters with aluminium on this lovely old chapel, this is 1 part of the renovation of it.

The Old Tannery, Holt, Wiltshire

20/10/2020

We have been awarded the contract for all the rainwater goods on this former tannery, being developed into new offices by Stonewood Builders

The Clockhouse, Sopley, Hampshire

16/10/2020

Start day of this old clockhouse going through a complete renovation, we are installing a large 200m x 150mm aluminium ogee gutter, this replicates the original cast iron, more pictures as the project

Country Life, Surrey

10/09/2020

What a beautiful place, this 17th century house in the Surrey countryside, a complete gutter and rainwater pipe replacement just after completion.

Greendale Construction, Friars Cliff

08/10/2020

Start day of fascia replacement with Mustang seamless guttering. A gutter with a 20 year guarantee, a fit and forget option.

Weymouth, Dorset

17/10/2020

First part of this large project for McCarthy & Stone, as usual 6 year old plastic guttering not doing its job, all being replaced with Mustang seamless aluminium gutter.

Poundbury, Dorset

15/10/2020

Who says size doesn’t matter, it took 8 men to lift this huge length of Mustang seamless gutter up in one.

Whitsbury, Hampshire

12/10/2020

A complete refurbishment by Dunford Construction to this beautiful country house, we have been contracted to replace all the cast iron rainwater goods with cast aluminium.

Wells, Somerset

07/10/2020

We were approached to finish a project another company had started, first stage for us a balcony fascia which runs the length of the property with a beautiful red cedar soffit.

Wareham, Dorset

07/10/2020

A property partly built in 1790 in need of a fascia refurbishment, it will be finished with new cast aluminium gutters and rainwater pipes

Sandbanks Peninsula, Dorset

13/10/2020

We have secured the contract for this 7 apartment development in Sandbanks, we are supplying all the copings, fascia’s and wall cladding, all finished in PPC aluminium RAL 7016 anthracite.

Barton On Sea, Hampshire

23/09/2020

A 6 house development on Barton cliff top, we have installed all the rainwater goods, aluminium roofline and all the radius copings, due for completion early 2021.

Hengistbury Head, Christchurch, Dorset

21/09/2020

Nearing completion, a stunning mono pitch design incorporating PPC aluminium fascia, Z-plank soffit and all rainwater goods, all the aluminium is powder coated to marine grade because of it’s beauti